Problems this addresses
- The installer and the landlord are working from different drawings
- Rack space, power and patching were not planned together
- There is no port schedule after the opening
- A second branch cannot be copied from the first
Services / Network design, rack layouts and documentation
Infrastructure
Drawings and schedules for racks, ports and networks so a branch can be installed and later supported without guesswork.
Unknown quantities and preliminary notes are enough to start.
Tell us the sites and the problem. We will come back with questions and a proposal. Support hours, response targets, on-site frequency and exclusions are confirmed in that proposal or in the agreement, not on this page.
Request an IT support proposal