Brochures / Network, cabling and projects brochure
Network, cabling and projects brochure
Networks, cabling, documentation and MEP coordination for fit-outs and branches.
Version date: 18 November 2026
Network and cabling
Switches, firewalls, Wi-Fi, VPN links, copper outlets and fibre. The documents that matter afterwards are the port schedule, the rack layout and a device list that someone else can read.
Projects
For a fit-out, MEP coordination means coordination of IT requirements with MEP contractors, including power, UPS requirements, containment, routes, equipment locations and drawing interfaces.
What we ask for
Floor plans if they exist, a rough count of data points and access points, and the systems that must be separated, such as POS, guest Wi-Fi, cameras and telephones.
